Sergey Tsimmerman
Сommercial Director
Microset
2006-2017 CEO “Dyuamel” LLC. Prospecting of gold ore. The exploitation of gold ore mines.
Rapid assessment of the cost of transshipment of 1 m3 of rock mass. Example of developing a alluvial gold deposit using modern methods
Operational cost estimate. Difficulties of implementation in remote fields.
Solutions:
-Creation of the necessary infrastructure: WiFi coverage at the field, equipping GPS equipment with controllers and sensors, video surveillance systems
-Equipment of loading equipment and bulldozers with a complex for measuring depth with 3D cameras
-Automatic data collection from the equipment on the enterprise server
-Analysis of the enterprise (volumes of transshipment, downtime, fuel consumption, maintenance and repair)
-Evaluation of the efficiency of the excavator, loader, dump truck for processing depth data from 3D cameras
-Evaluation of the performance of a bulldozer with 3D cameras with a depth map, accelerometer and gyroscope with the construction of a motion track